Dowds completed the M&E installations on the revolutionary new High Energy Proton Beam Cancer Therapy Centre in Thames Valley Science Park, Reading. The £30 million Rutherford Centre was hailed as one of the most exciting health and life sciences projects in Europe and includes facilities for proton beam therapy, a linear accelerator, a CT suite and an MRI.
The design and installation of the M&E services in such a heavily serviced and precisely engineered therapy centre, at the very cutting-edge of medical advancements, provided a multitude of technical challenges to ensure the effective and efficient operation of the facility. Attention to detail was critical whilst we were provided with specifications and drawings for the project we had to look beyond these and review multiple other documents and drawings to ensure we considered all essential components. Due to the specialist nature of the project Dowds partnered with numerous specialist contractors to complete the installations in complex rooms, which included linear accelerator bunkers, an MRI scan room, CT simulator room, CT Scanner, Superficial treatment room, X-ray rooms and chemotherapy suites.
To overcome coordination issues of working with various other on-site contractors we produced main plant deck drawings, showing our plant install routes and identifying plant areas reserved for other contractors. We held weekly coordination meetings with the specialist site teams to demonstrate the model and encouraged comment on walk-overs, where they could be installed and any possible clashes/problems that could arise. The programme for the M&E contract was extremely tight and there were a number of key milestones that had to be met – lives literally depended on it! Dowds Group worked closely with main contractors Graham to ensure we met the sectional and final handover dates so that the specialist equipment was installed and commissioned to meet the clients ‘go live’ date.
Michael Mitchan, Project Manager, Rutherford Estates
We very much enjoyed working with Dowds Group on this project, they have done a very good job. From management to site operatives we found their approach to work professional, friendly and helpful. Of particular mention is their post-contract support which has been a source of constant reassurance since handover.